ReactoN 18
18 kW(design target)
- Integrated fuel cell
- Industrial backup power
- Critical infrastructure
- Hospital backup
- Telecom
Investment funds TRL 5 demonstrator and TRL 6 field validation. Specifications below are design targets, not commercial product guarantees.
TRL 4 → TRL 6 · Roadmap · Target 2028
Integrated hydrogen power systems for industrial backup and off-grid infrastructure.
PRODUCT VARIANTS
18 kW(design target)
40 kW(design target)
USE CASES
Mining operations and remote facilities with no pipeline access. Hydrogen generated on-site eliminates fuel logistics.
Hospitals, data centers, and telecom facilities require zero-downtime backup power. Hydrogen backup eliminates battery degradation cycles.
DEVELOPMENT TIMELINE
2026–2027
ReactoN 0 TRL 5 demonstrator → core platform validated
2028
ReactoN 0 TRL 6 field validation → commercial pathway
2029
ReactoN 18/40 development begins → builds on proven platform
Pre-Seed investment funds ReactoN 0 development — the platform that enables the entire product family.